|
From: | Steve Railsback |
Subject: | [Swarm-Modelling] Literature on modeling concurrency |
Date: | Wed, 10 Mar 2004 16:26:23 -0800 |
User-agent: | Mozilla/5.0 (Windows; U; Windows NT 5.0; en-US; rv:1.0.1) Gecko/20020823 Netscape/7.0 |
Much of Swarm's guts is about specifying the order in which actions are executed, when the underlying assumption of time-step models is that all the actions occur concurrently each step. What are different ways to schedule concurrent events and what are their consequences? I want to know where I can send people to get smart on such problems.
I realize there are shelves-full of books on simulation, but the handful I have looked at do not seem to be helpful on this topic. (Some of them do not include the word "schedule" in their index.)
Thanks, Steve -- Lang, Railsback & Associates 250 California Ave. Arcata CA 95521 707-822-0453; fax 822-1868 address@hidden
[Prev in Thread] | Current Thread | [Next in Thread] |