phpgroupware-tracker
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[Phpgroupware-tracker] [Bug #1428] Double 27 on calendar


From: nobody
Subject: [Phpgroupware-tracker] [Bug #1428] Double 27 on calendar
Date: Sat, 26 Oct 2002 21:28:43 -0400

=================== BUG #1428: LATEST MODIFICATIONS ==================
http://savannah.gnu.org/bugs/?func=detailbug&bug_id=1428&group_id=509

Changes by: Dave Hall <address@hidden>
Date: 2002-Oct-27 12:28 (Australia/Melbourne)

            What     | Removed                   | Added
---------------------------------------------------------------------------
          Resolution | Works for me              | Fixed
              Status | Open                      | Closed


------------------ Additional Follow-up Comments ----------------------------
Since there are no followup posts, I am assuming everyone has run a cvs update 
... so i am closing this one



=================== BUG #1428: FULL BUG SNAPSHOT ===================


Submitted by: None                      Project: phpGroupWare                   
Submitted on: 2002-Oct-17 00:11
Category:  calendar                     Bug Group:  0.9.14 release              
Severity:  5 - Major                    Priority:  High                         
Resolution:  Fixed                      Assigned to:  skwashd                   
Status:  Closed                         Component Version:  TGZ                 
Platform Version:  Linux - RedHat       Reproducibility:  Every Time            

Summary:  Double 27 on calendar

Original Submission:  Lu Ma Me Je Ve Sa Di 
30 1 2 3 4 5 6 
7 8 9 10 11 12 13 
14 15 16 17 18 19 20 
21 22 23 24 25 26 27 
27 28 29 30 31 1 2 

double 27 on calendar
Date is shift

Follow-up Comments
*******************

-------------------------------------------------------
Date: 2002-Oct-27 12:28             By: skwashd
Since there are no followup posts, I am assuming everyone has run a cvs update 
... so i am closing this one

-------------------------------------------------------
Date: 2002-Oct-23 14:52             By: skwashd
This has been corrected in CVS.

To grab a complete update of all fixes:

1)  Check to see if you have cvs installed: 'cvs --help'.
1a) If not, install a copy of cvs-cli from your favorite 
distro.

2)  Then just type:
    'cd <your phpgroupware dir>; cvs update -dP'.

You can do step 2 as many times in a day as you wish, and 
will always get the most current bug fixes.

Thanks,


-------------------------------------------------------
Date: 2002-Oct-20 21:48             By: pauldane
I fixed this problem by getting the latest CVS

-------------------------------------------------------
Date: 2002-Oct-17 22:58             By: Als
I also have this bug.

-------------------------------------------------------
Date: 2002-Oct-17 09:28             By: fredbox
two October 27ths here also, both Saturday and Sunday


CC list is empty


File Attachments
****************

-------------------------------------------------------
Date: 2002-Oct-17 00:11  Name: calendar.jpg  Size: 131KB   By: None
Calendar Bug on date
http://savannah.gnu.org/bugs/download.php?group_id=509&amp;bug_id=1428&amp;bug_file_id=111


For detailed info, follow this link:
http://savannah.gnu.org/bugs/?func=detailbug&bug_id=1428&group_id=509




reply via email to

[Prev in Thread] Current Thread [Next in Thread]