help-octave
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [OctDev] control-2.3.51 released in package forum - please upload


From: c.
Subject: Re: [OctDev] control-2.3.51 released in package forum - please upload
Date: Mon, 4 Jun 2012 19:19:14 +0200

Lukas, 
Thanks for your great work!

I ran the tests on OSX 10.6 with Apple's vecLib and get the failures below [1]
which you already said should be considered as "no problem".

On 4 Jun 2012, at 18:56, marco atzeri wrote:
> I expect a package test function to behave reasonable correctly
> for most of the system. Borderline case or alternative valid solution
> should be avoided.

I agree with Marco, if you think these results are to be considered correct, 
you should change the tests so that they are not reported as failures.
This is particularly important as, for example, Debian packagers will not 
produce a .deb 
for your package until they see failing tests, and we reaally do want to see 
the 
control package in Debian!

c.


[1] 

 ***** assert (Mo, Me, 1e-4);
!!!!! test failed
assert (Mo,Me,1e-4) expected
  -0.23910   0.30720   1.16300   1.19670  -1.04970
  -2.97090  -0.23910   2.62700   3.10270  -3.70520
   0.00000   0.00000  -0.51370  -1.28420   0.82230
   0.00000   0.00000   0.15190  -0.51370   0.74350
  -0.44660   0.01430  -0.47800  -0.20130   0.02190
but got
  -0.23915   0.30723   1.16297  -1.19671   1.04965
  -2.97091  -0.23915   2.62702  -3.10273   3.70515
   0.00000   0.00000  -0.51368   1.28421  -0.82227
   0.00000   0.00000  -0.15189  -0.51368   0.74348
   0.44660  -0.01427   0.47803  -0.20129   0.02190
maximum absolute error 7.41035 exceeds tolerance 0.0001
shared variables 
  scalar structure containing the fields:

    Mo: 5x5 matrix
    Me: 5x5 matrix
    Info: 1x1 scalar struct
    HSVe: 6x1 matrix

...

  ***** assert (Mo, Me, 1e-4);
!!!!! test failed
assert (Mo,Me,1e-4) expected
   0.59460  -0.73360   0.19140  -0.33680   0.00150
   0.59600  -0.01840  -0.10880   0.02070  -0.02020
   1.22530   0.20430   0.10090  -1.49480   0.01590
  -0.03300  -0.02430   1.34400   0.00350  -0.05440
   0.35340   0.02740   0.03370  -0.03200   0.00000
but got
   0.59461  -0.73360  -0.19139   0.33685   0.00146
   0.59599  -0.01839   0.10883  -0.02070  -0.02016
  -1.22535  -0.20431   0.10090  -1.49478  -0.01592
   0.03300   0.02426   1.34404   0.00350   0.05444
   0.35342   0.02743  -0.03372   0.03204   0.00000
maximum absolute error 2.45065 exceeds tolerance 0.0001
shared variables 
  scalar structure containing the fields:

    Mo: 5x5 matrix
    Me: 5x5 matrix
    Info: 1x1 scalar struct
    HSVe: 8x1 matrix


reply via email to

[Prev in Thread] Current Thread [Next in Thread]