[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: [PATCH] gnu: Update pcre2 to 10.21
From: |
Efraim Flashner |
Subject: |
Re: [PATCH] gnu: Update pcre2 to 10.21 |
Date: |
Fri, 8 Apr 2016 14:20:58 +0300 |
User-agent: |
Mutt/1.6.0 (2016-04-01) |
On Thu, Apr 07, 2016 at 04:29:54PM -0600, Mckinley Olsen wrote:
> Updating pcre2 to satisfy the 10.21 requirement newer versions of
> vte/vte-ng have (which I hope to package)
I ran into an issue while building julia with the new pcre2. I've
attached the build log and the error is here also:
From worker 3: * floatfuncs in 47.53 seconds,
maxrss 1698.39 MB
ERROR: LoadError: test failed: isready(rr1)
in expression: isready(rr1)
in error at ./error.jl:21
in default_handler at ./test.jl:30
in do_test at ./test.jl:53
in include at ./boot.jl:261
in include_from_node1 at ./loading.jl:304
in process_options at ./client.jl:280
in _start at ./client.jl:378
while loading
/tmp/guix-build-julia-0.4.3.drv-0/julia-0.4.3/test/parallel_exec.jl,
in expression starting on line 253
WARNING: Forcibly interrupting busy workers
WARNING: rmprocs: process 1 not removed
From worker 3: * parallel
From worker 4: * inline in
2.69 seconds, maxrss 146.05 MB
--
Efraim Flashner <address@hidden> אפרים פלשנר
GPG key = A28B F40C 3E55 1372 662D 14F7 41AA E7DC CA3D 8351
Confidentiality cannot be guaranteed on emails sent or received unencrypted
5ggcj13m61s1pvkzavdi907yczvav9-julia-0.4.3.drv.bz2
Description: Binary data
signature.asc
Description: PGP signature