gnash-commit
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [Gnash-commit] /srv/bzr/gnash/trunk r12193: merge from branch. Exter


From: Rob Savoye
Subject: Re: [Gnash-commit] /srv/bzr/gnash/trunk r12193: merge from branch. ExternalInterface is now mostly complete other than actually setting the variables and calling method.
Date: Fri, 21 May 2010 09:11:24 -0500
User-agent: Mozilla/5.0 (X11; U; Linux x86_64; en-US; rv:1.9.1.9) Gecko/20100423 Thunderbird/3.0.4

On 05/21/2010 09:04 AM, Benjamin Wolsey wrote:

> There is no way those System tests could have passed if you had really
> checked. The external interface tests fail a Gnash assertion. Perhaps
> you could check again.

  I ran the testsuite several times before checking in the changes,
which shouldn't have effected the System tests anyway. This was on an
x86_64 Lucid platform. As I'll be going through your comments and making
more changes this morning, I'll obviously be checking again. :-)

  My plan is to not implement the final bit of setting scriptable
variables or actually calling any methods till this stabilizes. I'm
still traveling anyway, so that's on the todo list for next week.

        - rob -



reply via email to

[Prev in Thread] Current Thread [Next in Thread]