emacs-orgmode
[Top][All Lists]
Advanced

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: TODO or checkboxes in org tables


From: Axel Kielhorn
Subject: Re: TODO or checkboxes in org tables
Date: Sat, 2 May 2020 10:46:59 +0200

Hi Uwe,

> I have an orgtable with a lot of useful information, I would like to add
> a column either for TODOS or checkboxes but it seems not work any idea
> whether such an addon package exist or any change that such a feature
> will be implemented?

I use a different approach.
I store the information in a normal org structure with TODO keywords.
I hide the checkboxes (and other meta information) in a drawer.

From this I generate a column view to present the information in a table.

You can generate different column views from the same data set.
I used the second version for years but recently discovered the :match argument.
If you mark the actual data as :noexport: only the table will be printed.

Greetings
Axel


** Arbeitsfortschritt
:PROPERTIES:
    :EXPORT_FILE_NAME: Beispiele
    :EXPORT_OPTIONS: num:nil
    :COLUMNS:  %50ITEM(Problem) %5PB(Nr BP) %11TODO(Status) %6TAGS(Wer) 
%10TERMIN(Termin) %7ERLEDIGT(Erledigt){X/} %6SICHERHEIT(Sicher){X/}
    :ID: Aufgaben
:END:

*** 2017-10-19 [5/7]
**** CAD nachpflegen Lasertaster                                     :BKI:
:PROPERTIES:
:TERMIN: 
:PB: 1
:ERLEDIGT: [ ]
:END:
**** DONE Ventilinsel                                                :BKI:
:PROPERTIES:
:ERLMON:   [X]
:PB:       2
:ERLEDIGT: [X]
:END:
- Kollision mit Verkleidung prüfen
**** DONE Schaltschrank
    CLOSED: [2017-11-22 Mi 11:52]
    :PROPERTIES:
    :PB:       3
    :ERLEDIGT:   [X]
    :TERMIN: 2017-12-05
    :END:
**** DONE Schutzverkleidung
    CLOSED: [2017-10-20 Fr 09:29]
    :PROPERTIES:
    :PB:       4
    :ERLEDIGT:   [X]
    :TERMIN: 2017-11-03
    :SICHERHEIT: [ ]
    :END:
**** Projektleiter Bodenverankerung (Bohrtiefe)                       :PL:
    :PROPERTIES:
    :PB:       5
    :ERLEDIGT: [ ]
    :END:
- Befestigung kundenseitig
**** DONE Wartungseinheit
    CLOSED: [2017-11-02 Do 07:54]
    :PROPERTIES:
    :PB:       6
    :ERLEDIGT:   [X]
    :END:
- Luftzuführung
- zusätzlicher Verteiler für gesicherte Luft
- Rejekt und Stopper mit Einzelventilen
**** DONE Roboter Vakuumerzeuger
    CLOSED: [2018-01-16 Di 13:33]
    :PROPERTIES:
    :PB:       7
    :ERLEDIGT: [X]
    :END:
- Bohrung in Rahmen fertig
- Blechteil fehlt noch



*** Aushang Arbeitsfortschritt

#+BEGIN: columnview :hlines 1 :id "Aufgaben" :indent t :match "/-DONE" :format 
"%50ITEM(Problem) %5PB(Nr) %12TODO %8TAGS(Wer) %12Termin"
#+attr_latex: :align p{3.5cm}rlll  
| Problem                              | Nr | TODO            | Wer   | Termin |
|--------------------------------------+----+-----------------+-------+--------|
| \_  Arbeitsfortschritt               |    |                 |       |        |
| \_    2017-10-19                     |    |                 |       |        |
| \_      Lasertaster                  |  1 | CAD nachpflegen | :BKI: |        |
| \_      Bodenverankerung (Bohrtiefe) |  5 | Projektleiter   | :PL:  |        |
| \_    Aushang Arbeitsfortschritt     |    |                 |       |        |
#+END

*** Aushang Arbeitsfortschritt (alt)

#+BEGIN: columnview :hlines 1 :id "Aufgaben" :indent t :format 
"%50ITEM(Problem) %5PB(Nr) %12TODO %8TAGS(Wer) %12Termin 
%7ERLEDIGT(Erledigt){X/}"
| Problem                              | Nr | TODO            | Wer   |     
Termin | Erledigt |
|--------------------------------------+----+-----------------+-------+------------+----------|
| \_  Arbeitsfortschritt               |    |                 |       |         
   | [0/1]    |
| \_    2017-10-19                     |    |                 |       |         
   | [5/7]    |
| \_      Lasertaster                  |  1 | CAD nachpflegen | :BKI: |         
   | [ ]      |
| \_      Ventilinsel                  |  2 | DONE            | :BKI: |         
   | [X]      |
| \_      Schaltschrank                |  3 | DONE            |       | 
2017-12-05 | [X]      |
| \_      Schutzverkleidung            |  4 | DONE            |       | 
2017-11-03 | [X]      |
| \_      Bodenverankerung (Bohrtiefe) |  5 | Projektleiter   | :PL:  |         
   | [ ]      |
| \_      Wartungseinheit              |  6 | DONE            |       |         
   | [X]      |
| \_      Roboter Vakuumerzeuger       |  7 | DONE            |       |         
   | [X]      |
| \_    Aushang Arbeitsfortschritt     |    |                 |       |         
   |          |
#+END


reply via email to

[Prev in Thread] Current Thread [Next in Thread]