[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[O] Repeated tasks
From: |
N. Raghavendra |
Subject: |
[O] Repeated tasks |
Date: |
Fri, 13 May 2016 10:46:57 +0530 |
User-agent: |
Gnus/5.13 (Gnus v5.13) Emacs/25.1.50 (darwin) |
Is there a way to specify the timestamp for a repeated task which has to
be done on the second Sunday of every month? I'd like the todo state of
the task to go back to TODO after it has been marked DONE, as described
in the section on repeated tasks in the Org manual.
Thanks,
Raghu.
PS: I am sorry if you get multiple copies of this message. I use Gmane
to read this list, and tried to post this message through Gmane, but
didn't get the confirmation message from the Gmane auto-authorizer. So
I am posting it now directly to the list. Does anyone else have
similar difficulties posting through Gmane?
--
N. Raghavendra <address@hidden>, http://www.retrotexts.net/
Harish-Chandra Research Institute, http://www.hri.res.in/
- [O] Repeated tasks,
N. Raghavendra <=