[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[O] Visibility cycling with inline tasks
From: |
Christopher Witte |
Subject: |
[O] Visibility cycling with inline tasks |
Date: |
Thu, 13 Sep 2012 15:38:01 +0200 |
Hi all,
I have a document with lots of inline tasks scattered throughout it. I
want to get an overview of the document so I use S-<TAB> to cycle to
CONTENTS, when I do that all of the inline tasks are displayed like
this:
* 1
** 2
*************** TODO 4
*************** END
*************** TODO 5
*************** END
*************** TODO 6
*************** END
*************** TODO 7
*************** END
*************** TODO 8
*************** END
** 3
this makes getting an overview of the document very difficult (it is
hard to tell that 2 and 3 are at the same level). By using a numeric
prefix that is less than the level of inline tasks but more than the
highest level used in the document (for instance M-5 S-<TAB>) I can
get the result I would expect:
* 1
** 2...
** 3
Should this be the default? Is this also the behaviour that other people expect?
Cheers,
Chris Witte.
- [O] Visibility cycling with inline tasks,
Christopher Witte <=