[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[Orgmode] must date+time stamps require the day of the week to be proces
From: |
Eric S Fraga |
Subject: |
[Orgmode] must date+time stamps require the day of the week to be processed correctly? |
Date: |
Thu, 08 Jul 2010 09:35:01 +0100 |
User-agent: |
Wanderlust/2.15.9 (Almost Unreal) SEMI/1.14.6 (Maruoka) FLIM/1.14.9 (Gojō) APEL/10.7 Emacs/23.1 (i486-pc-linux-gnu) MULE/6.0 (HANACHIRUSATO) |
In response to a recent email from Daniel Martins, I am trying to
improve my recently posted awk script for converting Google's ics
export to org entries.
I had through to convert the DTSTART and DTEND calendar entries into
two date+time stamps with -- connecting them [1], as in:
<2010-07-08 11:00>--<2010-07-09 12:00>
this combination doesn't seem to be recognised by the agenda view.
Only the first date+time stamp is recognised. However, if the day of
the week is in there:
<2010-07-08 Thu 11:00>--<2010-07-09 Thu 12:00>
this construct is recognised as a 1 hour long event!
Furthermore, when using S-<up> or S-<down> to manipulate the time of
day on the stamps without the day of the week, the day of the week is
inserted *but* the time of day is reset to midnight of that day.
Thanks,
eric
Footnotes:
[1] I can, of course, create a single time stamp with the time
interval, and that is what I shall do but I thought I'd highlight what
appears to be an inconsistency in behaviour.
--
Eric S Fraga
GnuPG: 8F5C 279D 3907 E14A 5C29 570D C891 93D8 FFFC F67D
[Prev in Thread] |
Current Thread |
[Next in Thread] |
- [Orgmode] must date+time stamps require the day of the week to be processed correctly?,
Eric S Fraga <=