[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[Rdiff-backup-bugs] [sr #105174] Operation Status indication?
From: |
anonymous |
Subject: |
[Rdiff-backup-bugs] [sr #105174] Operation Status indication? |
Date: |
Tue, 21 Feb 2006 00:02:35 +0000 |
User-agent: |
Mozilla/5.0 (Macintosh; U; PPC Mac OS X Mach-O; en-US; rv:1.8.0.1) Gecko/20060111 Firefox/1.5.0.1 |
URL:
<http://savannah.nongnu.org/support/?func=detailitem&item_id=105174>
Summary: Operation Status indication?
Project: rdiff-backup
Submitted by: None
Submitted on: Tue 02/21/06 at 00:02
Category: None
Priority: 5 - Normal
Severity: 1 - Wish
Status: None
Privacy: Public
Assigned to: None
Originator Email: kerinin_at_gmail_dot_com
Open/Closed: Open
Platform Version: None
_______________________________________________________
Details:
It would be really great if there was some way of knowing how much of a
particular operation had been completed. Not knowing how much of a backup
has finished, it is impossible to know if there are 15 minutes left or 3 days
- in some situations this could be quite significant.
A simple % transmitted would be sufficient. It could be based either on the
amount of data left to transfer or the number of files.
_______________________________________________________
Reply to this item at:
<http://savannah.nongnu.org/support/?func=detailitem&item_id=105174>
_______________________________________________
Message sent via/by Savannah
http://savannah.nongnu.org/
[Prev in Thread] |
Current Thread |
[Next in Thread] |
- [Rdiff-backup-bugs] [sr #105174] Operation Status indication?,
anonymous <=